Design Preview

Ultraframe Supply Costs — Apr 2026 price matrices

Buy prices calculated from the current Ultraframe pricing tools using the design dimensions, your account discounts, and the current surcharge. Check the figures, then apply them to the pricing sheet below.

Cornice, box gutters, posts, roof vents and other catalogue extras are added on the Extras tab and appear in this table automatically.

Windows & Doors Supply Costs

Window costs come from the Cost £ each column on the window schedule (Design tab). Enter your supplier figures below — when you have a supplier price list, it can be built in as an automatic matrix like the Ultraframe one.

This total feeds the Windows & Doors materials line automatically — no button needed.

Job Pricing — cost & profit per line

Enter your cost on each line — profit is added automatically at the section rates (Groundworks 10% · HUP Build 40% · Windows & Doors 30% · Other Services 10% · Administration 0%). You can adjust a section's rate on its header row for a specific job. Labour lines are driven by crew days below (3-man crew @ £1,000/day). VAT and the survey fee are added in the summary.

Extra lines are managed on the Extras tab.

Quote Summary

Total inc VAT£0
Profit margin

Ultraframe Catalogue Extras

Priced items from the Ultraroof and Livinroof workbooks — cornice, box gutters, posts, beams, valleys, roof vents and more. Each item carries its correct Ultraframe discount (roof vents use the Classic discount; the gallows bracket is non-discountable) plus the surcharge, and feeds the Ultraframe supply table on the Pricing tab.

Custom Job Extras

Anything else on the job — enter your cost and the Extras section profit rate (set on the Pricing tab, default 10%) is applied automatically. These appear in the Extras section of the pricing sheet.

Extras Summary

Planning & Building Regulations Check

Automatic checks based on the design. This is a staff guide, not formal advice — always confirm with Building Control / the local planning authority. Items flagged in amber or red need action or a cost adding to the pricing sheet.

Regs Summary

Profit Check

Total cost
£0
Charged (ex VAT)
£0
Profit
£0
Margin
0%
0%10% floor20% target50%+

Margin by section

Labour sense-check

Verdict